AN ACT to clarify that guaranteed energy savings contracts include conservation measures for water and other utilities, to raise the cap for guaranteed energy savings contracts, to expand the state's energy policy and life-cycle cost analysis to include the conservation of water and other utilities, and to make conforming changes.
The General Assembly of North Carolina enacts:
SECTION 1. The title of Article 3B of Chapter 143 of the General Statutes reads as rewritten:
"Article 3B.
Energy Conservation of Energy, Water, and
Other Utilities in Public Government Facilities."
SECTION 2. G.S. 143-64.17 reads as rewritten:
"§ 143-64.17. Definitions.
As used in this Part:
(1) "Energy
conservation measure" means a facility or meter alteration,
training, or services related to the operation of the facility,facility
or meter, when the alteration, training, or services provide anticipated
energy savings.savings or capture lost revenue. Energy
conservation measure includes any of the following:
a. Insulation of the building structure and systems within the building.
b. Storm windows or doors, caulking, weatherstripping, multiglazed windows or doors, heat-absorbing or heat-reflective glazed or coated window or door systems, additional glazing, reductions in glass area, or other window or door system modifications that reduce energy consumption.
c. Automatic energy control systems.
d. Heating, ventilating, or air-conditioning system modifications or replacements.
e. Replacement or modification of lighting fixtures to increase the energy efficiency of a lighting system without increasing the overall illumination of a facility, unless an increase in illumination is necessary to conform to the applicable State or local building code or is required by the light system after the proposed modifications are made.
f. Energy recovery systems.
g. Cogeneration systems that produce steam or forms of energy such as heat, as well as electricity, for use primarily within a building or complex of buildings.
h. Other
energy conservation measures.
i. Faucets with automatic or metered shut-off valves, leak detection equipment, water meters, water recycling equipment, and wastewater recovery systems.
j. Other energy conservation measures that conserve energy, water, or other utilities.
(2) "Energy
savings" means a measured reduction in fuel costs, energy costs, water
costs, stormwater fees, other utility costs, or operating costs costs,
including environmental discharge fees, water and sewer maintenance fees, and
increased meter accuracy, created from the implementation of one or more
energy conservation measures when compared with an established baseline of
previous fuel costs, energy costs, or operating costs costs,
including captured lost revenues, developed by the governmental unit.
(2a) "Governmental unit" means either a local governmental unit or a State governmental unit.
(3) "Guaranteed
energy savings contract" means a contract for the evaluation,
recommendation, or implementation of energy conservation measures, including
the design and installation of equipment or the repair or replacement of
existing equipment,equipment or meters, in which all payments,
except obligations on termination of the contract before its expiration, are to
be made over time, and in which energy savings are guaranteed to exceed costs.
(4) "Local governmental unit" means any board or governing body of a political subdivision of the State, including any board of a community college, any school board, or an agency, commission, or authority of a political subdivision of the State.
(5) "Qualified provider" means a person or business experienced in the design, implementation, and installation of energy conservation measures.
(6) "Request for proposals" means a negotiated procurement initiated by a governmental unit by way of a published notice that includes the following:
a. The name and address of the governmental unit.
b. The name, address, title, and telephone number of a contact person in the governmental unit.
c. Notice indicating that the governmental unit is requesting qualified providers to propose energy conservation measures through a guaranteed energy savings contract.
d. The date, time, and place where proposals must be received.
e. The evaluation criteria for assessing the proposals.
f. A statement reserving the right of the governmental unit to reject any or all the proposals.
g. Any other stipulations and clarifications the governmental unit may require.
(7) "State governmental unit" means the State or a department, an agency, a board, or a commission of the State, including the Board of Governors of The University of North Carolina and its constituent institutions."
SECTION 3. G.S. 143-64.17B(a) reads as rewritten:
"§ 143-64.17B. Guaranteed energy savings contracts.
(a) A governmental unit may enter into a guaranteed energy savings contract with a qualified provider if all of the following apply:
(1) The term of the
contract does not exceed 12 20 years from the date of the
installation and acceptance by the governmental unit of the energy conservation
measures provided for under the contract.
(2) The governmental unit finds that the energy savings resulting from the performance of the contract will equal or exceed the total cost of the contract.
(3) The energy
conservation measures to be installed under the contract are for an existing building.building
or utility system."
SECTION 4. The catch line of G.S. 143-64.17G reads as rewritten:
"§
143-64.17G. Report on guaranteed energy savings contracts.contracts
entered into by local governmental units."
SECTION 5. The catch line of G.S. 143-64.17H reads as rewritten:
"§ 143-64.17H.
Guaranteed Report on guaranteed energy savings contract
reporting requirements.contracts entered into by State governmental
units."
SECTION 6. G.S. 142-63 reads as rewritten:
"§ 142-63. Authorization of financing contract.
Subject to the terms and conditions set forth in this
Article, a State governmental unit that has solicited a guaranteed energy
conservation measure pursuant to G.S. 143-64.17A or G.S. 143-64.17B
or the State Treasurer, as designated by the Council of State, is authorized to
execute and deliver, for and on behalf of the State of North Carolina, a financing
contract to finance the costs of the energy conservation measure. The aggregate
principal amount payable by the State under financing contracts entered
pursuant to this Article shall not exceed fifty million dollars
($50,000,000) one hundred million dollars ($100,000,000) at any one
time."
SECTION 7. G.S. 142-64(b)(2) reads as rewritten:
"(2) The Council of State has approved the execution and delivery of the financing contract by resolution that sets forth all of the following:
a. The not-to-exceed
term or final maturity of the financing contract, which shall be no later than 12
years from the date the financing contract is entered.20 years from the
date of acceptance of the project.
b. The not-to-exceed interest rate or rates (or the equivalent thereof), which may be fixed or vary over a period of time, with respect to the financing contract.
c. The appropriate officers of the State to execute and deliver the financing contract and all other documentation relating to it."
SECTION 8. G.S. 143-64.10 reads as rewritten:
"§ 143-64.10. Findings; policy.
(a) The General Assembly hereby
finds:finds all of the following:
(1) That the State shall
take a leadership role in aggressively undertaking energy the
conservation of energy, water, and other utilities in North Carolina;Carolina.
(2) That State facilities
have a significant impact on the State's consumption of energy;energy,
water, and other utilities.
(3) That energy
conservation practices to conserve energy, water, and other utilities
that are adopted for the design, construction, operation, maintenance, and
renovation of these facilities and for the purchase, operation, and maintenance
of equipment for these facilities will have a beneficial effect on the State's
overall supply of energy;energy, water, and other utilities.
(4) That the cost of the energy
energy, water, and other utilities consumed by these facilities and
the equipment for these facilities over the life of the facilities shall be considered,
in addition to the initial cost;cost.
(5) That the cost of energy
energy, water, and other utilities is significant and facility
designs shall take into consideration the total life-cycle cost, including the
initial construction cost, and the cost, over the economic life of the
facility, of the energy energy, water, and other utilities consumed,
and of operation and maintenance of the facility as it affects energy
consumption; and the consumption of energy, water, or other
utilities.
(6) That State government
shall undertake a program to reduce energy the use of energy,
water, and other utilities in State facilities and equipment in those
facilities in order to provide its citizens with an example of energy-useenergy-use,
water-use, and utility-use efficiency.
(b) It is the policy of
the State of North Carolina to ensure that energy conservation practices
to conserve energy, water, and other utilities are employed in the
design, construction, operation, maintenance, and renovation of State
facilities and in the purchase, operation, and maintenance of equipment for
State facilities."
SECTION 9. G.S. 143-64.11(2) reads as rewritten:
"(2) "Energy-consumption
analysis" means the evaluation of all energy- consuming systemssystems,
including systems that consume water or other utilities, and components of
these systems by demand and type of energy,energy or other
utility use, including the internal energy load imposed on a facility by
its occupants, equipment and components, and the external energy load imposed
on the facility by climatic conditions."
SECTION 10. G.S. 143-64.11(2b) reads as rewritten:
"(2b) "Energy-consuming system" includes but is not limited to any of the following equipment or measures:
a. Equipment used to heat, cool, or ventilate the facility;
b. Equipment used to heat water in the facility;
c. Lighting systems;
d. On-site equipment used to generate electricity for the facility;
e. On-site equipment that uses the sun, wind, oil, natural gas, liquid propane gas, coal, or electricity as a power source; and
f.
Energy conservation measures measures, as defined in G.S. 143-64.17,
in the facility design and construction that decrease the energy energy,
water, or other utility requirements of the facility."
SECTION 11. G.S. 143-64.11(3) reads as rewritten:
"(3) "Facility"
means a building or a group of buildings served by a central energy distribution
system for energy, water, or other utility or components of a central energy
distribution system."
SECTION 12. G.S. 143-64.12 reads as rewritten:
"§ 143-64.12. Authority and duties of State agencies.
(a) The General Assembly
authorizes and directs that State agencies shall carry out the construction and
renovation of State facilities, under their jurisdiction in such a manner as to
further the policy declared herein, ensuring the use of life-cycle cost
analyses and energy-conservation practices.practices to conserve
energy, water, and other utilities.
(b) The Department of
Administration shall develop and implement policies, procedures, and standards
to ensure that State purchasing practices improve energy efficiency
regarding energy, water, and other utility use and take the cost of the
product over the economic life of the product into consideration. The
Department of Administration shall adopt and implement Building Energy Design
Guidelines. These guidelines shall include energy-use goals and standards,
economic assumptions for life-cycle cost analysis, and other criteria on
building systems and technologies. The Department of Administration shall
modify the design criteria for construction and renovation of facilities to
require that a life-cycle cost analysis be conducted pursuant to G.S. 143-64.15.
The Department of Administration, as part of the Facilities Condition and
Assessment Program, shall identify and recommend energy conservation
maintenance and operating procedures that are designed to reduce energy consumption
within the facility and that require no significant expenditure of funds. State
departments, institutions, or agencies shall implement these recommendations.
Where energy management equipment is proposed for State facilities, the maximum
interchangeability and compatibility of equipment components shall be required.
The Department of Administration shall develop a
comprehensive energy management program to manage energy, water, and
other utility use for State government. Each State agency shall develop and
implement an energy a management plan that is consistent with the
State's comprehensive energy management program.program to manage
energy, water, and other utility use.
(c) through (g) Repealed by Session Laws 1993, c. 334, s. 4."
SECTION 13. G.S. 143-64.15 reads as rewritten:
"§ 143-64.15. Life-cycle cost analysis.
(a) A life-cycle cost analysis shall include, but not be limited to, all of the following elements:
(1) The coordination,
orientation, and positioning of the facility on its physical site;site.
(2) The amount and type of
fenestration employed in the facility;facility.
(3) Thermal
characteristics of materials and the amount of insulation incorporated into the
facility design;design.
(4) The variable occupancy
and operating conditions of the facility, including illumination levels; andlevels.
(5) Architectural features
which that affect energy consumption.the consumption of
energy, water, and other utilities.
(b) The life-cycle cost analysis performed for any State facility shall, in addition to the requirements set forth in subsection (a) of this section, include, but not be limited to, all of the following:
(1) An energy-consumption
analysis of the facility's energy-consuming systems in accordance with the
provisions of subsection (g) of this section;section.
(2) The initial estimated
cost of each energy-consuming system being compared and evaluated;evaluated.
(3) The estimated annual
operating cost of all utility requirements;requirements.
(4) The estimated annual
cost of maintaining each energy-consuming system; andsystem.
(5) The average estimated replacement cost for each system expressed in annual terms for the economic life of the facility.
(c) The General
Assembly requires eachEach entity to shall conduct a
life-cycle cost analysis pursuant to this section for the construction or the
renovation of any State facility or State-assisted facility of 20,000 or more
gross square feet. For the replacement of heating, ventilation, and
air-conditioning equipment in any State facility or State-assisted facility of
20,000 or more gross square feet, the entity shall conduct a life-cycle cost
analysis of the replacement equipment pursuant to this section when the
replacement is financed under a guaranteed energy savings contract or financed
using repair and renovation funds.
(d) The life-cycle cost analysis shall be certified by a registered professional engineer or bear the seal of a North Carolina registered architect, or both. The engineer or architect shall be particularly qualified by training and experience for the type of work involved, but shall not be employed directly or indirectly by a fuel provider, utility company, or group supported by fuel providers or utility funds. Plans and specifications for facilities involving public funds shall be designed in conformance with the provisions of G.S. 133-1.1.
(e) In order to protect
the integrity of historic buildings, no provision of this Article shall be
interpreted to require the implementation of energy-cost measures to
conserve energy, water, or other utility use that conflict with respect to
any property eligible for, nominated to, or entered on the National Register of
Historic Places, pursuant to the National Historic Preservation Act of 1966,
P.L. 89-665; any historic building located within an historic district as
provided in Chapters 160A or 153A of the General Statutes; any historic
building listed, owned, or under the jurisdiction of an historic properties
commission as provided in Chapter 160A or 153A; nor any historic property owned
by the State or assisted by the State.
(f) Each State agency shall use the life-cycle cost analysis over the economic life of the facility in selecting the optimum system or combination of systems to be incorporated into the design of the facility.
(g) The energy-consumption
analysis of the operation of energy-consuming systems utilities in a facility
shall include, but not be limited to:to, all of the following:
(1) The comparison of two
or more system alternatives;alternatives.
(2) The simulation or
engineering evaluation of each system over the entire range of operation of the
facility for a year's operating period; andperiod.
(3) The engineering
evaluation of the energy consumption of energy, water, and other
utilities of component equipment in each system considering the operation
of such components at other than full or rated outputs."
SECTION 14. This act is effective when it becomes law and applies to contracts entered into or renewed on or after that date.
In the General Assembly read three times and ratified this the 19th day of July, 2006.
s/ Beverly E. Perdue
President of the Senate
s/ James B. Black
Speaker of the House of Representatives
s/ Michael F. Easley
Governor